Power line and substation install – Kirby, PA

Project Details

Year: 2014

Project Duration: Completed in 2016

For this project, the Rogers Electrical Contracting Company, Inc. team has been busy installing several miles of power lines and completing construction on a substation in a remote location for the coal industry.

(function($){ $("#justified_gallery_W2YbnR").justifiedGallery({ sizeRangeSuffixes : { 'lt100': '', 'lt240': '', 'lt320': '', 'lt500': '', 'lt640': '', 'lt1024': '' },rowHeight: 200, margins: 0, lastRow: "justify", fixedHeight: false, captions: false, captionsColor: "#000000", captionsOpacity: 0.7, randomize: false, maxRowHeight: 0, rel: "W2YbnR", target: null, refreshTime: 250, cssAnimation: true, captionsAnimationDuration: 500, imagesAnimationDuration: 300, captionsVisibleOpacity: 0.7, class: "", }) .on('jg.complete', function(){ $('#justified_gallery_W2YbnR').photobox('a',{title: false, counter: "(A/B)", thumbs: true, autoplay: false, time: 3000, zoomable: false, history: false, }); }); var galleries = []; var gallery = $("#justified_gallery_W2YbnR"); $(window).scroll(function() { if ( galleries.length >= 1 ) { var scroll_top = $(window).scrollTop(); var scroll_bottom = scroll_top + $(window).height(); var gallery_top = $(gallery).offset().top; var gallery_height = $(gallery).innerHeight(); var gallery_bottom = gallery_top + gallery_height; if( gallery_bottom <= scroll_bottom ) { var images = galleries.splice(0,1); var image_html = $("#load_more_holder_W2YbnR").html(images).text(); $(gallery).append(image_html); $(gallery).justifiedGallery('norewind'); } } }); })(jQuery); #justified_gallery_W2YbnR .sgg-caption { background: rgb(0,0,0); background: rgba(0,0,0,0.7); color: #ffffff; font-size: 1em; font-weight: 400; font-family: Helvetica, Arial, sans-serif; } #load_more_W2YbnR { background: #444444; color: #ffffff; }
Rogers Electrical

246 Business Park Drive • Fairmont, WV • 304.363.5752 • Linked In

WV049346

SITE HANDCRAFTED BY The STICK Co.