Year: 2012
Project Duration: 8-month completion
For this project, the Rogers Electrical Contracting Company, Inc. team installed all of the main electrical components for the site. The installation included fiberglass conduit, incoming switch-gear, pad mount transformers, 2500 HP VFD controllers, 300HP VFD controllers, soft-starts, lights, heaters, HVAC, instrumentation, and control panels.
246 Business Park Drive • Fairmont, WV • 304.363.5752 • Linked In
WV049346
SITE HANDCRAFTED BY The STICK Co.