Year: 2014
Project Duration: 5-month completion
For this project, the Rogers Electrical Contracting Company, Inc. team installed 15 valve station RTU panels, which included solar panels and wireless communication capabilities throughout West Virginia and Pennsylvania for the oil and gas industry.
[smart-grid last_row=”justify” margins=”0″ captions=”false” title=”false” zoomable=”false”]
#gallery-1 { margin: auto; } #gallery-1 .gallery-item { float: left; margin-top: 10px; text-align: center; width: 33%; } #gallery-1 img { border: 2px solid #cfcfcf; } #gallery-1 .gallery-caption { margin-left: 0; } /* see gallery_shortcode() in wp-includes/media.php */[/smart-grid]
246 Business Park Drive • Fairmont, WV • 304.363.5752 • Linked In
WV049346
SITE HANDCRAFTED BY The STICK Co.