Project Details

Year: Early 2020

Project Duration:

The Rogers Electrical Contracting Co., Inc. team performed the Design and Build of many items to complete this turnkey Project.

Just to name a few – the Utility 138kv Metering, a 50MVA 138-34.5kv Substation, the 34.5kv Power Distribution, two 30MVA 34.5-12.47kv Substations, the 12.47kV Power Distribution to multiple feeds, and a complete SCADA system.